Construction project management services

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
16 July 2021
Closing Date:
19 August 2021
Location(s):
DEA23 Köln, Kreisfreie Stadt (DE Germany/DEUTSCHLAND)
Description:
Project management services for the new building of a canteen building for Henry Ford Realschule, Cologne

Project management services based on the AHO publication series number 9 “Project management services in the construction and real estate industry” of the AHO commission “Project management/project management”, as of 2020, areas of action A, B, C, D and E, familiarization with the results of project stage 1 and project stages 2 to 5

New construction of a canteen building for Henry Ford secondary school

Karl-Marx-Allee 43, 50769 Cologne

Appendix 1 of this contract notice contains the task description and must be observed.

Project management services based on the AHO publication series number 9 “Project management services in the construction and real estate industry” of the AHO commission “Project management/project management”, as of 2020, areas of action A, B, C, D and E, familiarization with the results of project stage 1 and project stages 2 to 5

For the new building of a canteen building for Henry Ford Realschule, Karl-Marx-Allee; 50769 Cologne

The extension includes a canteen with a complete kitchen area for open all-day operation as well as side rooms, care rooms, complementary classrooms for media library and teacher workstations. The usable area for aforementioned areas is approximately 1 470 sqm in total. The design of the canteen is intended for the simultaneous catering of around 140 students (depending on the seating). The dining room is accessed through the foyer, which has a two-storey airspace. Vertical access and distribution across the hallways also follows in the central foyer. The sanitary facilities, including barrier-free toilets, are also located in the central core. In addition to the kitchen and its adjacent rooms and the dining room, there are also teacher workstations, an all-day office, the media library and an inclusion room on the ground floor. On the upper floor, 3 additional inclusion rooms and 5 care rooms and lounges as well as a chemical room including a preparation room are arranged.

The new building is planned as a two-storey building with a flat roof. A spacious glass façade towards the schoolyard (south-east) provides an unobstructed view of the neighboring green areas. The large cantilever of the canopy and the generous glazing towards the schoolyard creates the effect of a large frame and a prestigious, modern façade with facing masonry that opens up towards the park.

When choosing building materials, particular attention is paid to sustainability and ecological compatibility.

In the course of design planning, the aspects of energy saving and sustainability were optimised in advance through intensive planning and consultation of specialist engineers in such a way that the new building can not only be implemented from an ecological point of view, but also economically sensibly.

A total budget of approximately EUR 6.34 million (net) was determined for the construction project for cost groups 200-700 (excluding cost groups 710 and 760).

Provision is for a phased allocation on call, first familiarization with the results of project stage 1 and project level 2 to 3 (planning and preparation for execution).

There is no legal right to further commissioning.

The complete description of the procurement is listed in Appendix 1 to the contract notice and must be observed.