Bat enclosure tunnel Forst and Hirsau
In the two existing tunnels "Forst" and "Hirsau"
Reopening of the Weil der Stadt - Calw section as Hermann
Hesse-Bahn for the bats living there. For this purpose, a continuous separation is to be installed in the tunnels in order to spatially separate the "railway chamber" from a future "bat chamber". This separation is carried out by a steel structure with full-surface infill by aluminum elements, as is common in noise barrier constructions.
Trennwandkonstruktion:
Excavation approx. 2,600 m³
Produce foundations approx. 860 m3
Micropiles approx. 320 pcs
Wiederauffüllung ca. 1,650 m³
Steel construction approx. 1,350 t
Lärmschutzelemente ca. 12,000 m²
Trapezblecheindeckung ca. 2,000 m²
Cross-linking open enclosure approx. 4,500 m²
Rettungstreppe:
Rockfall protection net with edge rope and anchors approx. 150 m²
Foundation reinforced approx. 42 m³
Staircase construction with supports S 235 J2+N approx. 10 t
Füllstabgeländer ca. 144 m
Gratings with steps approx. 108 m²