New service workshop Meiningen - painting work
The Erfurt Railway awards i. A. Süd-Thüringen-Bahn GmbH Construction work for the construction of a new service workshop in Meiningen. Here painting work.
- approx. 2 035 m 2 Surface filler reinforced concrete walls, full area,
- approx. 472 m 2 First coat of walls, plastic dispersion base,
- about 153 m 2 First coat of supports / base, plastic dispersion base,
- approx. 2 256 m 2 Glass fabric,
- approx. 150 g / m 2 , Fine structure, on wall surfaces, including painting,
- approx. 1 302 m 2 Top coating as PU sealing,
- approx. 261 m 2 Surface filler reinforced concrete ceilings, including joint filling; approx. 261 m 2 First coat of ceiling, plastic dispersion base,
- 7 St. steel doors, double-leaf; 22 St. steel doors, single-leaf; 31 pieces of steel frame,
- approx. 428 m 2 Coating system DIN EN ISO 12944-5, protection period M, corrosivity category C 3, on steel components.