B 10, replacement construction of the Enz bridge near Niefern, BW 7018 702.
- Steel girders for bridge structure: 24 pieces;
- Concrete work: 2,800 m
- Supply reinforcing steel: 500 t;
- In-situ concrete bored pile: 56 pieces;
- Create sheet pile wall (temporary): 950 m
- Create sheet pile wall (permanent): 450 m
- Earthworks: 9,000 m
- Asphalt works: 4,200 m
- Establish a drainage pipe: 200 m;
- Make a concrete shaft structure: 1 pc.