Funding from the state government of North Rhine-Westphalia is provided for this measure.
The subject of the award procedure is the measure of the energetic renovation of the quadruple hall Deichtorstrasse: In this award, the painting work is advertised.
The sports hall has 1 lower and 1 ground floor on a floor area of approx. 50.00 mx 60.00 m. With a building height of approx. 7 m above and 3.50 m below the top of the site. The building is being extensively renovated. The creation takes place under difficult conditions within a water protection zone. Appropriate water protection measures must be taken to carry out the services.
Work: Painting work to the following extent:
- Preparation of the surface for stuck old coatings on concrete and masonry, 490 m²;
- adhesive bridge, 490 m²;
- Plastering work on cleaning defects, 53 m²;
- plastic reinforcement 300, 30 m;
- slits closing 30 mm x 30 mm, 50 m;
- slots closing 50 mm x 50 mm, 30 m;
Sealing:
- Acrylic joint sealing, 4 100 m;
- silicone joint sealing, 2 300 m;
- Renew damaged joint seals between the prefabricated stands, 320 m;
Painting:
- Basic coating for filling work on coated existing walls, 700 m²;
- Block off area separating substances, wall, 700 m²;
- Q 3 leveling existing and new ceilings, smooth plasterboard, 550 m²;
- Q 3 leveling existing and new inner wall, gypsum plaster, plasterboard, 320 m²;
- Q 3 filling from 3.5 m - allowance, 35 m²;
- Q 3 leveling existing and new cement boards, 35 m²;
- Q 3 leveling existing and new skylight frames, 95 m²;
- Q 3 leveling existing and new supports, 30 m;
- Q 3 leveling existing and new window and door lintels, 70 m;
- Q 3 leveling existing and new reveals, 115 m;
- Base and top coating with emulsion paint, acoustics plasterboard, 2 500 m²;
- Base and top coating with emulsion paint, ceilings, from 3.5 m - allowance, 1 700 m²;
- Base and top coating with emulsion paint, ceilings, smooth plasterboard, 550 m²;
- Base and top coating with emulsion paint, interior walls, gypsum plaster, plasterboard, 3 750 m²;
- Base and top coating with emulsion paint, interior walls, from 3.5 m - allowance, 400 m²;
- Base and top coat with emulsion paint, fungicide - allowance, 570 m²;
- Base and top coat with emulsion paint, cement boards, 35 pieces;
- Base and top coating with emulsion paint, skylight surrounds, 95 m²;
- Base and top coating with emulsion paint, supports, 30 m;
- Base and top coating with emulsion paint, window and door lintels, 70 m;
- Base and top coating with emulsion paint, reveals, 115 m²;
- Base and top coating with emulsion paint, existing reinforced concrete wall, 430 m²;
- Supplement richly tinted, 430 m²;
- Base and top coating with dispersion paint, existing exposed masonry, 450 m²;
- protective coating, 280 m²;
painting:
- Top coating frames, 1.01 * 2.135 m / 350 mm, 6 pieces;
- Top coating frames, 1.01 * 2.135 m / 270 mm, 16 pieces;
- Top coating frames, 1.01 * 2.135 m / 150 mm, 58 pieces;
- Protective film door frames, 80 pieces;
- Roughening radiator coating, 9 m²;
- final coating of radiator paint, 9 m²;
- Forward and return of the radiator lines, 2 m;
- synthetic resin lacquer on primed steel structures inside;
- Steel structure primed / synthetic resin lacquer, 135 m;
- Supplement for additional primer / copolymer resin, 65 m;
- Steel structure with 2K epoxy primer, 35 m;
- Additional top coat / KH paint color, 25 m;
- synthetic resin paint on galvanized steel structures on the outside;
- galvanized steel structure / synthetic resin lacquer, 175 m;
Coating floors:
- Dust-binding paint, 35 m²;
- Floor coatings with 2K epoxy seal, 85 m²;
- base coat, 65 m;
- Oil-resistant paint in the elevator shaft, 15 m²;
Concrete protection paints DIN 18363:
- Remove impurities by high pressure cleaning, 160 m²;
- algae and Ä. remove, treat surfaces fungicide, 35 m²;
- Scratch filler / organically bound cavity filler, 25 m²;
- Intact dispersion paint / pure acrylic, concrete gray, 160 m².
Evidence work hourly wages DIN 18299.