Object and structural planning according to § 43 and § 51 HOAI
Coming from Idstein in the north, the B 275 first turns southwest and passes under the
BAB A3. Then it runs first on the northern slope of the Roßberg (425 m) and then turns south into the valley area of the Auroffer Bach and crosses it. Inside
of the valley area leads a branch to the K 708 in the direction of Ehrenbach and Oberauroff.
At construction km 0+300 there is a connection to a forest road on the left side of the road, which opens up the forest departments in the district of Maisel, town of Taunusstein. This connection remains in the new planning and is the only one of its kind From construction km 0+000 to the end of construction.
Due to new alignment elements, it is necessary to plan a support structure at km 3+016 to km 3+144 to accommodate the road system BW 6 for slope stabilization.
In the area of the so-called Engländerkurve from building 2+774 to the end of construction there are rocky slopes, which, however, do not require any safety measures due to the present planning.
During the construction work, the old B275 must be kept at least 1-lane passable.
For the project referred to in point II.1.4 of this notice, the following services are essentially to be provided:
-Performance profile Object planning Civil engineering structures Support structure for accommodating the road system + built-ups, work phases 1-3
- Performance profile Structural design support structure for mounting the road system + built-ups, work phases 2-3
-SiGeKo