The construction project includes the surface works for the new building of the OU Bad Fredeburg over a length of approx. 3000 m
approx. 1500 m3 topsoil removal and application
Deliver and cover approx. 3750 m3 of topsoil
approx. 26000 m3 earthworks
Milling approx. 22650 m2 asphalt
Take up approx. 6500 t pitch-containing fastening
install approx. 60000 t of frost protection material
produce approx. 35350 m2 asphalt base layer
produce approx. 31650 m2 asphalt binder layer
approx. 31500 m2 asphalt surface layer made of SMA 11 shearls
Produce approx. 3550 m2 of asphalt surface layer from AC 11DN
install approx. 4000 t banquet material