The contract concerns the supply of natural gas for the period 01/04/2024 – 31/03/2025, for a total consumption estimated at 999,604 cubic meters, at the sludge drying plant of the wastewater treatment plant in Jesi (AN) located in Via della Barchetta snc, with a delivery point directly connected to the Snam network, REMI/PDR: 00000050090901.
The contract concerns the supply of natural gas for the period 01/04/2024 – 31/03/2025, for a total consumption estimated at 999,604 cubic meters, at the sludge drying plant of the wastewater treatment plant in Jesi (AN) located in Via della Barchetta snc, with a delivery point directly connected to the Snam network, REMI/PDR: 00000050090901.