To cover the demand for electrical energy for SLP and RLM acceptance points, the district of Erding needs a new electricity supply contract for the period from 01.01.2023 to 31.12.2024. The present procedure serves to determine this contractor.
City of ErdingThe lot comprises a total of 74 delivery points with approx. 5 GWh of electricity per year, divided into
• 65 non-performance-measured delivery points with approx. 3.3 GWh and
• 10 performance-measured with approx. 1.7 GWh delivery points.
The addresses of the individual delivery points, connection and consumption data can be found in the "Delivery point overview" and the load profile data (for the RLM delivery points) provided by the customer.
Town of DorfenThe lot comprises a total of 11 delivery points with approx. 0.7 GWh of electricity per year, divided into
• 9 non-performance-measured delivery points with approx. 123,000 kWh and
• 2 performance-measured with approx. 581,000 kWh delivery points.
The addresses of the individual delivery points, connection and consumption data can be found in the "Delivery point overview" and the load profile data (for the RLM delivery points) provided by the customer.
Municipality of TaufkirchenThe lot comprises a total of 9 delivery points with approx. 0.2 GWh of electricity per year, divided into
• 8 non-measured delivery points with approx. 86,000 kWh and
• 1 performance-measured with approx. 128,000 kWh delivery points.
The addresses of the individual delivery points, connection and consumption data can be found in the "Delivery point overview" and the load profile data (for the RLM delivery points) provided by the customer.