Project: New building of the Edith-Stein schools Rottweil 3 full floors BRI 14 840 cbm Total construction time: July 2018 to December 2019
Fireproof terminations T30
- approx. 6 pcs steel / glass door elements T30 / T30 RS, single-leaf,
- approx. 6 steel / glass door elements T30 / T30 RS double leaf,
Same design as F30 / T30 design but without tape protection requirements:
- approx. 5 pcs of steel / glass door elements,
- 2 windscreen elements inside, steel-glass construction approx. 18 sqm per element.