The subject of the contract is the implementation of the task called "Extension of the national road No. 65 on the section Gąski – Ełk from km 52+095.62 to km 65+734.88".
The subject of the contract is the implementation of the task called "Extension of the national road No. 65 on the section Gąski – Ełk from km 52+095.62 to km 65+734.88". It includes: execution of a new roadway structure with a permissible load of 115 kN / axis with a width of 8.0 m; correction of vertical and horizontal curves; construction/reconstruction of culverts; demolition of the old bridge and construction of a new bridge in the m. Straduny; construction and reconstruction of pedestrian routes; construction of bicycle paths; extension of intersections; construction of bus bays; reconstruction of the bus loop in m. Straduny; reconstruction of parking spaces; construction of road lighting; felling/planting of trees, shrubs; execution of road drainage; construction of a technological channel; construction / reconstruction of exits; execution of BRD elements; construction of acoustic screens; demolition of buildings in homestead buildings in m. Ploughmen; reconstruction of the existing technical infrastructure interfering with the designed road.
Total estimated order of magnitude of the contract value: above 20,000,000 euros.