the consultation is carried out according to an adapted procedure for the award of allotment works contracts with optional tranches :P for lot 5 - interior joinery - lining - partitions - ceilings - insulationsto 1: Mobile wall class 1-2to 2: Mobile wall class 3-6for lot 6 - electricity - photovoltaic panelsto1: Maintenance and remote monitoring of the solar power plantall work is divided into 10 lots. The following lots 2, 4 and 5 are subject to an execution condition relating to the hiring of audiences far from employment detailed in article 1.6 of the Cahier des Clauses Administratives Particulières (C.C.A.P.). No mandatory variants are foreseen and candidate-initiated variants are not allowed
demolition - asbestos pollutiondemolition of the former housing of the Jean Jaurès school group and asbestos decontamination
FLOOR COVERINGSFloor Covering Works
structural work - masonry - tiles - faiencestructural work - masonry - tiles - earthenware inside the building
Cover - WaterproofRoofing and waterproofing work
Exterior joinery - locksmiths - metalworkexterior carpentry work - locksmithing and metalwork
interior joinery - linings - partitions - ceilings - insulationinterior carpentry work - lining - partition - ceilings - insulation
electricity - photovoltaic panelswork of supply, installation and connection of all equipment necessary for the installation of electricity and photovoltaic panels
plumbing - sanitary - heating - ventilationwork of supply, installation and connection of any equipment necessary for plumbing - sanitary - heating - ventilation installations
painting - acoustic coatings - signagepainting work, acoustic coatings, signage and cleaning
Elevatorelevator installation work