Slow traffic connection Schiphol Trade Park - Hoofddorp station
- the realization of a wooden slow traffic bridge with load-bearing handrails, central pillar and 2x free span of approximately 10 m
- the realization of a slow traffic bridge with steel bridge deck with wooden deck planks and a free span of approximately 10 m
- the realization of 2 slow traffic bridges with a concrete bridge deck and a free span of approximately 10 m
- drawing up the implementation design for the bridges mentioned above
- temporary facilities and the execution of groundwork for the realization of the above-mentioned bridges
- the installation of a temporary cycle path of approximately 600 m1
- the installation of an asphalt cycle path of approx. 100 m1
- applying stairs about 25 m
- applying element pavements of approx. 370 m2
- installing public lighting with accessories around 11 pieces