24 GWh of energy divided into 2 lots, consisting of approximately 13,5 GWh of electricity and 10 GWh of gas. This will be a 36-month contract with an option to extend by 12 months. This will be at the sole discretion of the Post Office Ltd.
Estimated 190 sites with approximately 13,5 GWh of consumption per annum. Requires a 36 month flex contract beginning 1.4.2020 with an option to extend by 12 months.
Flexible contract for 10 GWh per annum of gas on a 36 month contract beginning 1.4.2020 with an option to extend by 12 months.