Lot 503 Ventilation systems: Delivery, installation and commissioning of ventilation systems in the ventilation centres of the safety tunnel including delivery and integration of the new control system into the control system.
Lot 503 Ventilation systems: Delivery, installation and commissioning of ventilation systems in the ventilation centres of the safety tunnel including delivery and integration of the new control system into the control system.