Services according to HOAI service phases 1 to 9 for the new construction of a rail vehicle workshop for the operational and heavy maintenance of electric, combustion-powered and alternative drive technologies (e.g. fuel cells) equipped traction vehicles.
The rail vehicle workshop should have the following essential characteristics:
- workshop halls (multi-track),
- social, storage and administrative rooms,
- workshop equipment including all machine systems,
- outdoor facilities including development,
- Track systems (workshop tracks, siding, feeder),
- 15 kV catenary system inside and outside the factory, including feeder track,
- Control and safety technology (EOW and technical railway safety systems),
- underfloor wheel lathe,
- optional external cleaning system,
- traffic engineering systems for motor vehicles.