In the course of the restructuring of the town centre, the city of Freiberg am Neckar intends to build the new
Oscar-Paret-Schule (OPS 1st construction phase already completed. ) and a three-field sports hall with adjoining
Sports areas (2nd construction phase).
By lowering the sports hall by one storey, the level access to the foyer and
of the grandstand system from the urban space as well as a continuous equipment room. In addition, the
Sports hall in the urban space as a transparent sports and event hall.
The spacious foyer of the sports hall is accessed from the market square, a separate athletes' entrance is the
School square facing the school. Via an additional staircase, the gymnastics room and the outdoor sports areas are accessible from the
Changing rooms in the basement available.
VE 510-200 Outdoor systems
Type and scope of the service:
Surface areas:
- approx. 1800 m² concrete block pavement: partly accessible by the fire brigade
- approx. 1600 m² asphalt paths: partly radial and underbuilt
- approx. 1200 m² synthetic surfaces: EPDM and artificial turf for sports and playing fields
- approx. 600 m² water-bound path surface: as a tree grove and bicycle storage facility
Fixtures and equipment:
- approx. 20 waste bins
- approx. 160 m fences up to a height of 800 cm
- approx. 40 m angle retaining walls to intercept embankments
- approx. 25 luminaires
- 3 seats with wooden cushions
- approx. 150 bicycle racks: partially underpinned
Sports and playing fields:
- DFB mini-pitch with roof construction
- Running track and long jump facility
- Kugelstoßanlage
Vegetation areas:
- ca. 40 Solitärgehölze
- approx. 250 m² Heckenpflanzungen
- approx. 4000 m² lawn and meadow sowing