The orthopaedic building complex built at the beginning of the 30s in Semmelweis-/Philipp-Rosenthal-Straße, which has already been renovated and converted several times, for the last time as a psychiatry, is again in need of renovation. A core task is the complete replacement of the ailing drinking water system, including connection to the public utilities, as well as the upgrading of the low-voltage grid, especially in the telecommunications sector. In addition, there are mandatory interventions in the main building distribution to ensure operation.
48 hrs Patch panels, mounting in PBX network cabinets
11,900 m Cat 7 data cable
196 St. Anschlußdosen RJ 45
300 m cable tray/conductor
140 m Brandschutzkanal
Measuring, testing, documenting