Drainage sewer work, asphalt work, paving, edging each, including earthworks in the yard and pathway areas on the hospital premises on newly built wing of the building.
335 m² demolition of existing paving, 325 m³ earth and trench excavation, 125 m PP drainage channels DN 100- DN 200, 33 m gutters/heavy duty gutters, 7 pcs farm inlets, 535 m² asphalt areas incl. substructure, 150 m² concrete paving incl. substructure, 95 m curbs