New construction cycle path and road repair (1.3 km)
(Demolition, earthworks, foundation, little works management work, edge closures, covering work, roadway drainage, adaptation Einlaufbauwerk Vollikerbach, support systems).
Along the Meilenerstrasse, from the intersection Bergstrasse / Mööslistrasse, a cycle path in the direction of Egg is built up to the intersection Meilenerstrasse / Chnolliweg. In addition, the existing road in this perimeter is repaired depending on the condition of the road (from partial replacement padding to total replacement superstructure). There are 2 public waters in the perimeter, whereby a body of water is revitalized and in the second body of water the intake structure has to be adjusted. Supporting systems must also be installed to protect the slope.
New construction cycle path and road repair (1.3 km)
(Demolition, earthworks, foundation, little works management work, edge closures, covering work, roadway drainage, adaptation Einlaufbauwerk Vollikerbach, support systems).
Along the Meilenerstrasse, from the intersection Bergstrasse / Mööslistrasse, a cycle path in the direction of Egg is built up to the intersection Meilenerstrasse / Chnolliweg. In addition, the existing road in this perimeter is repaired depending on the condition of the road (from partial replacement padding to total replacement superstructure). There are 2 public waters in the perimeter, whereby a body of water is revitalized and in the second body of water the intake structure has to be adjusted. Supporting systems must also be installed to protect the slope.