The object of the order is the design and reconstruction of the two-pipe platform on the railway line No. 73 Sitkówka Nowiny — Busko-Zdrój:
- Małogoszcz station in km 27,160 — 27,467
- Włoszczowice station in km 19,553 - 19,813
- Dębska Wola passenger stop km 13,907 — 14,157
on the railway line no. 61 Kielce — Fosowskie
- together with drainage, single-level access to the platform with an appropriate standard tailored to local conditions and other necessary works in the accompanying industries, as well as replacement of the track surface and protective layer of the undertorch along with the construction of dehydration of the trackbed.
Design and execution of works for the modernization of the platform at Małogoszcz station carried out in the framework of the construction/ modernization of railway stops for the period 2021-2025Modernization of the railway platform at Małogoszcz station in the area of the Railway Line Plant in Kielce” in the framework of the “Government programme of construction or modernization of railway stops for the period 2021 — 2025
Design and execution of works for the modernization of the platform at Włoszczowice station carried out in the framework of the construction/ modernization of railway stops for the period 2021-2025“Modernization of the railway platform at Włoszczowice station on the territory of the Railway Line Plant in Kielce” in the framework of the “Government programme for the construction or modernization of railway stops for the period 2021 — 2025”
Design and execution of works for the modernization of the platform at the Dębska Wola passenger stop carried out in the framework of the construction and modernization of railway stops for the period 2021-2025“Modernization of the railway platform at the Dębska Wola passenger stop in the area of the Railway Lines Plant in Kielce” as part of the “Government programme for the construction or modernization of railway stops for the period 2021 — 2025”