The planned construction project at the Ebendorfer Chaussee junction consists of the dismantling of existing tram tracks, the completion of a double-track partial quadrangle (switch heads west and south) and the laying of tram tracks for reconnection to the west.
For the construction of the tram line, existing road traffic facilities and supply lines must be relocated or adapted.
The construction project includes the following measures:
• Installation of the double-track west end for a partial track quadrangle
• Installation of the double-track south end for a partial track quadrangle, including the
Completion of all core elements and intermediate rails, so that the square
is passable.
• Reconstruction of an approx. 132 m long track section in the Ebendorfer Chaussee,
including technical equipment
• New construction of an approx. 25 m long track section in Milchweg, including
technical equipment
• New construction of two stops
Adaptation of a traffic light system at the junction
• Renewal or adaptation of street lighting
• Relocation or re-routing of power lines and RW ducts
• Mast positions for a catenary system (the construction of the actual FL
Attachment is the subject of a separate order)
Lot 1 MVBServices MVB according to the specifications
Lot 2 AGM (waste water)Services AGM according to the bill of quantities
Los 3 SWM (TW, Elektro, Informationsanlagen)Pipeline construction SWM according to specifications