Ventilation and air-conditioning installation work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
08 September 2023
Closing Date:
05 October 2023
Location(s):
DE939 Stade (DE Germany/DEUTSCHLAND)
Description:
23E60203 - New construction of the Stade tax office, construction of ventilation and refrigeration systems

Ventilation:

Two central ventilation units, each with 13,000 m3/h, supply all offices and ancillary rooms with supply and exhaust air.

The ducts are led through a shaft to the floors and there in the hallway or through the offices as

Flat channel distributed.

Smaller dimensions are carried out in spiral seam pipe.

There are volume flow controllers and silencers in front of the grilles in the offices. The main routes are preserved

Throttle valves, numerous fire dampers must be provided.

Only the exhaust and outside air ducts on the 3rd floor are insulated.

Quantities:

2 ventilation units with 13,000 m3/h

2100 m2 sheet metal duct system

1,460 m spiral seam pipe up to DN 250

364 pcs grille outlets in the offices

204 St Tellerventile

30 swirl outlets in the meeting rooms

369 pcs Volumetric flow regulator and limiter

523 St Silencer

165 St Brandschutzklappen

Cold:

The server room will be equipped with a split system with 5 kW.

The meeting rooms will be equipped with a 20 kW chiller on the roof and ceiling cassettes in the

Evacuate. The piping is carried out with insulated copper pipes.

Quantities:

1 pcs climate split outdoor with indoor unit, 5 kW

2 pcs outdoor units heat pumps for cooling, a total of 20 kW

5 pcs ceiling cassettes 4-sided

90m copper pipe OD 18-28mm, insulated

Ventilation:

Two central ventilation units, each with 13,000 m3/h, supply all offices and ancillary rooms with supply and exhaust air.

The ducts are led through a shaft to the floors and there in the hallway or through the offices as

Flat channel distributed.

Smaller dimensions are carried out in spiral seam pipe.

There are volume flow controllers and silencers in front of the grilles in the offices. The main routes are preserved

Throttle valves, numerous fire dampers must be provided.

Only the exhaust and outside air ducts on the 3rd floor are insulated.

Quantities:

2 ventilation units with 13,000 m3/h

2100 m2 sheet metal duct system

1,460 m spiral seam pipe up to DN 250

364 pcs grille outlets in the offices

204 St Tellerventile

30 swirl outlets in the meeting rooms

369 pcs Volumetric flow regulator and limiter

523 St Silencer

165 St Brandschutzklappen

Cold:

The server room will be equipped with a split system with 5 kW.

The meeting rooms will be equipped with a 20 kW chiller on the roof and ceiling cassettes in the

Evacuate. The piping is carried out with insulated copper pipes.

Quantities:

1 pcs climate split outdoor with indoor unit, 5 kW

2 pcs outdoor units heat pumps for cooling, a total of 20 kW

5 pcs ceiling cassettes 4-sided

90m copper pipe OD 18-28mm, insulated

Download full details as .pdf
The Buyer:
Land Niedersachen vertreten durch das Staatliche Baumanagement Niedersachsen
CPV Code(s):
45000000 - Construction work
45331200 - Ventilation and air-conditioning installation work