The community of Feldkirchen intends to build a residential complex with lunchtime care, multifunctional room, 2 clusters of senior citizens' homes and an underground car park.
The planning site is located in a residential area that is adjacent to the special use in the east.
In the north, the railway line represents a border with the adjoining industrial park.
The proposed structures encompass a shared courtyard in a relaxed position, which forms the center of the quarter.
The publication includes the achievement of painting works,
— Start on site: 26.1.2022,
— completion: 16.1.2023.
core quantities,
— epoxy resin flooring approx. 1 128 m
— hydrophobization of walls, ceiling styles etc. indoor and outdoor approx. 720 m
— hydrophobic supports, indoor area approx. 50 m
— hydrophobic ceilings, indoor and outdoor area approx. 330 m
— staircase, stb ceilings, stairways, pedestals, spatula+coating silicate, approx. 780 m
— staircase, stb walls, stairways, approx. 1 800 m
— stb ceilings, spatula+coating silicate, approx. 3 950 m
— stb walls, spatula+coating silicate, approx. 6 250 m
— interior plaster, coating silicate, approx. 900 m
— perforated GK ceilings, silicate paint, approx. 590 m
— GK ceilings smooth, coating silicate, approx. 1 180 m
— GK walls, coating silicate, approx. 9,700 m
— painting steel door leaves, 47 pieces,
— painting frames b = up to 450 mm, 1 400 m,
— painting stair railings, approx. 370 m,
— underground car park marking, approx. 275 m,
— Underground car park marking, pitch numbering, 82 pieces.