The project is organized around a large outdoor and covered porch that ensures continuity between the large forecourt and the north-south axis of the campus. It consists of 5 levels in concrete superstructure (ground floor to R + 3) including a technical floor, inaccessible to the public, located between the R + 1 and the R + 2
structural work - waterproofing - vRD and green spacesstructural work - waterproofing - vRD and green spaces
Interior joineryInterior joinery
LocksmithLocksmith
Painting and signagePainting and signage
furniture and benchfurniture and bench
Exterior joinery and blackoutsExterior joinery and blackouts
Facade cladding in plaster - exterior insulationFacade cladding in plaster - exterior insulation
Mobile and fixed vertical aluminium bladesMobile and fixed vertical aluminium blades
Strong and weak currentsStrong and weak currents
HVAC - Plumbing - GtCHVAC - Plumbing - GtC
liftslifts
Partitions - Dubbing - False CeilingsPartitions - Dubbing - False Ceilings
screeds - hard and flexible flooring - earthenwarescreeds - hard and flexible flooring - earthenware