Haus Gracht is a first-generation care facility and was built around 1967
built. After more than 50 years of use, the entire complex is in need of modernization.
As a special requirement of the carrier, the modernization and expansion during ongoing operation was formulated.
A viable solution was developed for this logistical problem and the construction project was divided into two
stages of construction divided:
In the 1st BA from May 2019 to February 2021, in the area of the aborted
connecting building a new building (extension) with 109 care places and a
Ground floor part erected with functional rooms (transverse structure in the middle, completed).
In the 2nd BA from March 2021 to December 2022, the existing building should be transferred to the
The shell was dismantled, extended by a hall and comprehensively renovated (front).
Subject of the tender are steel construction and locksmith work