The Montessori Förderkreis Rothenburg od T. e. V. plans to build a new Montessori elementary and middle school with after-school care in BA I and expansion of a single-field sports hall in BA II.
The primary school will have 4, the middle school 6 classes and the after-school care center 2 groups for a total of 213 students.
The plot has a total size of 16,680 m
The basic idea of the design is the connection of 3 building wings with a joint as the center. This forum serves as the heart of the school, which not only connects the 3 building parts, but also the floors with one another via an air space.
The load-bearing structure of the school building is designed as a reinforced concrete frame construction and is to be designed for an increase in all areas.
Overall, the new school is planned as a compact and very economical building. It brings together the currently separate Montessori branches - primary level in the Neusitz district and secondary level in the old town of Rothenburg under one roof.
Type of services:
Drywall work wall ceiling, fire safety, sound insulation
Scope of services:
— drywall approx. 1 700 m
— installation pretext outer wall approx. 1 000 m
— suspended ceilings approx. 500 m
— WC partition wall systems approx. 10 pcs,
— Acoustic ceiling elements approx. 950 m.