Heating installation work as part of the construction project new primary school with hoorway and sports hall in Grünhainichen.
The services to be awarded are the construction of the new heat generation plant (200 kW), which consists of a heat pump and a gas condensing boiler, the heat distribution network for the heat supply of the sports hall and the school building, and the room heating surfaces. The school building is heated by steel tube radiators, and the sports hall and the adjoining rooms are equipped with sports floor or underfloor heating. The sports floor heating itself is not part of this performance.