Direct order in accordance with LBM's own letter dated 17.12.2020 (AZ: F VIII/10)
ca. Accommodate 600 m2 of asphalt pavement
Approx. 2520 m2 of concrete ceiling
approx. 3120 m2 Pick up layer or binder
approx. 3750 m2 Qualf. Soil improvement through.
Produce approx. 4500 m2 of flat surface
ca. Spreading 150 t of binder
Produce approx. 1500 m3 of frost protection layer
ca. Produce 700 m2 of asphalt base course
ca. Produce 850 m2 of asphalt surface course
Produce approx. 3250 m2 of concrete slab
ca. Absorb 480 m3 of stored soil