three buildings are concerned with this project: Building Administration: Asbestos Removing, Accessibility PMR and Renovation of the Heating System Semi-Grand Building: This 1967 building in the state of proven obsolete is intended to be demolished and rebuilt.? Building Workshop GMP: The planned works are: the refurbishment of the fenced and canopy and the improvement of the heating mode
Demolition-Asbestos Removerdemolition and asbestos removal
Partitions-Lining-CeilingsPartitions-Lining-Ceilings
Suspended ceilingsSuspended ceilings
hard floor coverings- wall tileshard floor coverings- wall tiles
Flexible floor coveringsFlexible floor coverings
PaintingPainting
Heating-Ventilation-PlumbingHeating-Ventilation-Plumbing
Electricity- strong currents- low currentsElectricity- strong currents- low currents
ElevatorElevator
earthworks- VrD- green spacesearthworks- VrD- green spaces
Cleaningcleaning end of work
Big workconstruction of a new building
wood framing - wood sidingframing and siding
Cover-SealingCover-Sealing
siding and metal meshMetal cladding
aluminium exterior joinery - blackoutaluminium exterior joinery - blackout
Metallery-LocksmithMetallery-Locksmith
Sectional doorsSectional doors
Interior joineryInterior joinery