General renovation of the Edmund-Grom primary and secondary school, 2nd construction phase (renovation of the sports hall), Hohenroth community: demolition and structural work
Demolition and structural work.
Demolition:
- 8 pieces of demolition of window elements 5.65 / 2.40 m,
- 17.5 m 3 Production of window and door openings,
- 35 m 3 Demolition of brickwork,
- 35 m 2 Demolition of the starboard ceiling,
- 25 m 2 Demolition of wooden board truss ceiling.
Structural work:
- 10 m 2 Outer walls 36.5 cm brick masonry,
- 120 m 2 Inner walls made of 11.5 cm brick masonry,
- 50 m 2 Inner walls made of 17.5 cm brick masonry,
- 15.0 m 3 Filling concrete,
- 230 m 3 Trenches for pipelines,
- 200 m 3 Soil exchange with delivery material,
- 200 m sewer,
- 55 m district heating.