To reach the Pasewalk location, the waste water must be pumped over by means of dirty water pressure pipes to drain the SW. The waste water is then discharged into the public pipeline network of the city of Pasewalk and discharged to the sewage treatment plant. The integration point is located in Dargitzer Straße west of the B 109 at the Shell petrol station.
122 m DN200, 25 m DN600, 8 shafts (plastic) depth up to 4.0 m, 1715 m wastewater pressure pipeline DN 80 (90 x 5.4), 1715 m wastewater pressure pipeline DN 100 (125 x 7.4), 1 pressure interrupter shaft with ventilation fireplace, 2 pcs B/E valves, 315 m³ filling floor for terrain modelling