The subject of the contract is the delivery of 2 (in words: two) photovoltaic installations supplying devices on fire protection facilities along with tech infrastructure. in the Wolsztyn District and the service of assembly of the above-mentioned installation together with the infrastructure.
The scope of the contract includes, among others:
-execution of photovoltaic power supply along with battery support noticeable fire protection. Plaintiff and Huta;
-installation of a radioline antenna in the fire protection room. Plaintiffly operating in the 5GHz band unlicensed in the direction of the office building of the Wolsztyn Forest District in Wolsztyn;
-installation of a radioline antenna on a fire protection room. Fire. Steelworks in the direction of perceptible fire protection. Reasoned to operate in unlicensed 5GHz bands;
-installation of a radioline antenna on the building of the Forest District operating in the unlicensed 60GHz band in the direction of the fire protection perceived. Reason;
-installation of alarm and monitoring system on the fire protection room. Plaintiff and Huta;
-extension of the grounding installation of the fire tower;
-power supply from the internal network of the Forest District 0.4kV with battery support;-
- extension of the lightning protection system on the roof of the building;
- INSTALLATION OF THE PAD cabinet