Complete project management mission for the IGH decommissioning of building A of the CROUS universitaire Etienne Dolet located at 25 Rue Etienne Dolet in Clermont-Ferrand (63000).
The building is classified as IGH type Z within the meaning of Article R. 122-2 of the CCH.
- Full basic mission + complementary missions DQED - OPC - SSI
Estimated start date of the mission: November 2023.
Downgrading IGH of a building consisting of 5 levels (basement at R+3 included) accessible to the public (ERP 1st category in the IGH right-of-way) and 10 levels (R+4 at R+13) of student housing.
Missions (according to MOP law n ° 85-704 of July 12, 1985, decree n ° 93-1268 of November 29, 1993 and order of December 21, 1993):
Firm tranche "Studies": missions DIA, APS, APD, deposit of the PC, SSI (AVP design phase)
Optional tranche 1 "PRO-DCE studies": PRO, DQED, AMT, SSI missions (PRO-CJEU design phase)
Optional tranche 2 "realization of the works": EXE, VISA, DET, AOR, SSI missions (realization phase)
The project management team will be formed into a joint group with joint agent:
- principal agent: a TCE design office (minimum skills in ISS)
- co-contractors: an architect (for PC file), a construction economist.
Qualifications OPQIBI 1216, 1217, coordination SSI 0322 and 0321 (certificates or equivalent references for one or more members of the project management team).