Cleaning and EIFS work as part of the renovation of the Plattling secondary school, including:
- Supplement of EIFS with plaster on the exterior façade in the area of window openings
- Renovating, revising and re-plastering interior wall plaster
Cleaning and EIFS work as part of the renovation of the Plattling secondary school, including:
1. Addition of ETICS with plaster of the outer façade in the area of window openings in 1 construction phase with
- approx. 380m² reveal, pillar and lintel insulation with mineral fibre insulation material
- ca. 380m² armierter Silikatputz
- Working on an existing EIFS system
2. Renovate, revise and replaster interior wall plaster in 3 construction phases with
- approx. 1,500 m² old plaster revision
- approx. 400 m² new plaster as lime-cement/gypsum interior wall plaster
Implementation in 3 construction phases until 2024
The use of the building remains during the construction period.
The building is divided into processing zones