St. Marienwörth Hospital
Renovation of the bed house in component A to C
level +3
Gewerk heating, ventilation installation.
— approx. 215 m
— approx. 315 m of galvanised sheet steel air pipes
— approx. 68 pieces fire dampers with mortar,
— approx. 117 air inlets and outlets,
— approx. 110 m
— 1 piece DDC substation with electrical installation,
— approx. 160 m carbon steel piping with thermal insulation
— Approximately 30 pieces of hygiene heat bodies with fittings.
Estimated execution times:
— Implementation period 1 BA: September 2021 to April 2022,
— Implementation period 2 BA: May 2022 to January 2023,
— Implementation period 2 BA: February 2023 to July 2023.