Electrical installation (23 E 0159)
Building 3 with its 98 accommodations extends over the ground floor, first floor and attic, as well as basement. The accommodations will each be equipped with a sub-distribution. In each of the accommodations there are sockets, network sockets, antenna junction boxes and lighting. The bathroom is equipped with lighting and electrical outlets. A sub-distribution is also installed in the kitchenettes or study group rooms for the corresponding circuits. In addition, the lighting, data sockets and antenna sockets will be installed. Approx. NYM 3x1.5 6.7 km, 3x2.5 6 km, 5x10 2km, earthing socket 1390 pieces, 880 luminaires, emergency lighting 36 pieces, lightning protection and earthing system, coaxial cable 4.2km, fiber optic 600m, Cat7 AWG22 16.6 km, construction site power distributor 14 pieces, control line 13km