The object of the order is to draw up the design documentation of the reconstruction and protection of the cross section of the Kaniów, from the outlet from the Saurau chamber to the end of the outlet from the Kraj chamber on the Karol longitudinal, located at the level of the III Salt Mine “Wieliczka” and the exercise of copyright supervision in during the implementation of the work provided for by the design documentation, in accordance with the tender process.
1. The object of the order is to draw up the design documentation of the reconstruction and protection of the crossbar of the Kaniów, on the section from the departure from the Saurau chamber to the end of the outlet from the Kraj chamber on the Karol longitudinal, located at the level III Wieliczka Salt Mine, hereinafter referred to as the “Design Documentation” and the exercise of copyright supervision during the implementation of the work provided for the Design Documentation, in accordance with the offer submitted in the framework of the tender procedure.
2. As part of the subject of the contract, the Contractor shall be obliged to:
1) the development of the technical design of the reconstruction and protection of the Kaniów crossbar located at level III of the Wieliczka Salt Mine, hereinafter referred to as the “Technical Project”, its arrangements with the Ordering Party's services, with the Conservator of the Monuments of Krakow Salt Żup (hereinafter referred to as “KZKŻS”), and subsequently obtaining the approval of the agreed technical project by the Head of the Mining Plant Movement “Wieliczka” Salt Mine (hereinafter referred to as the KRZG);
2) obtaining the authorisation of the KZKŻS to perform works covered by the technical project — KZKŻS operates in accordance with the agreement of 21 June 2017 on the entrustment of certain matters concerning the properties of the Lesser Poland Voivodeship Conservator of Monuments in Kraków (Journal of Urz. Woj. Monkey of 26 June 2017, item 4200);
3) drawing up the subject of works, the investor cost estimate and the in-kind and financial timetable for works covered by the technical project.
3. In the exercise of copyright supervision during the implementation of works covered by the Design Documentation, the Contractor shall be obliged to carry out authorial supervision of a maximum of 96 hours.
Details of the subject matter of the contract and the rules for its implementation are contained in the template of Annex 14 to the SWZ, which is available at: https://kopalniawieliczka.ezamawiajacy.pl/