Full power supply of green electricity from existing plants to the collection points of the city of Teltow
Supply of green electricity from existing plants free of charge to the city of Teltow for a contract period of 1 1/2 years
(01.07.2022 to 31.12.2023).
The total volume for municipal consumption and street lighting is
- for the 2nd half of delivery in 2022, around 1,172 MWh for approx. 112 purchase points and
- For the 2023 delivery year, around 2,263 MWh/a for approx. 112 acceptance points.
The collection points are located in the network area of E.DIS Netz GmbH.
The pricing for procurement takes place after the award of the contract on the EEX marketplace, structured in 4 tranches
for the 2nd half of 2022 and the delivery year 2023 over a period of 3 weeks.
Proof of green electricity supply from existing plants is provided via the guarantee of origin register in accordance with the EURiDirective 2009/28/EC or in accordance with § 79 EEG 2021 or in a comparable form.