The expansion and energy-efficient renovation of the community center in Hausen with a small sports hall is planned in 2 construction phases.
The service includes master builder work.
— approx. 1100 m² demolition of metal roofing including wooden formwork;
— approx. 23.5 m³ dismantling, disposal of roof truss wood, hipped roof
— approx. 7 pcs dismantling StB-Binder 40/115 cm, L 22.5 m
— approx. 1.75 m³ demolition StB support 40/40 cm
— approx. 15.50 m³ partial demolition Stb grandstand stairs, 3 stairs
— approx. 330 m³ excavation along buildings, loaded, mechanical,
— approx. 390 m² laying perimeter insulation WLG 040 140 mm, vertical,
— approx. 16 m³ angle retaining wall, concrete, formwork, C35/45, d=25-30 cm,
— approx. 215 m annular anchor reinforced concrete, formwork, 24 x 30cm, 3-sided formwork,
— 7 pcs FT fitted bed trusses, C35/45, L up to 24 m
— approx. 16 pcs FT reinforced concrete attic, C35/45, H 1.50 m
— approx. 4.1 t of structural steel 500 m
— approx. 11 tonnes of structural steel 500 S
— ca. 300 m² Außenmauerwerk KS-R-Plan 1,8, SFK > =12/DM, d = 24,0 cm
— ca. 442 m² Innenmauerwerk-nichttragend KS-Plan 1,4, SFK > = 12/DM, D 11,5 cm
— ca. 40 m² Innenmauerwerk-nichttragend KS-R-Plan, EI 30, 1,4, SFK > = 12/DM, D 24 cm
— ca. 128 m² Innenmauerwerk-nichttragend KS-R-Plan, EI 30, 1,4, SFK > = 12/DM, D 20 cm