- Bus hall:
—— Replace gas heating with chimney,
—— create a new heating group and insulation,
—— regroup existing heating groups and insulate pipes,
—— existing district heating group, pipe replacement and insulation,
- Company building:
—— Groundwater system with heat pump and air conditioning via geothermal probe,
—— Relocation of the district heating pipe and insulation,
—— Heating group ceiling sails for heating and cooling incl. Cable assembly,
—— Heating group radiator existing Connection to new heating group, delivery and installation of new radiators,
- Heating group ceiling system in plaster for heating and cooling,
—— Heating group ventilation connection to heating and insulation,
—— Cold distribution connection to the convection cooler, insulation,
- commissioning,
- Documentation (for further details see submission documents).
- Bus hall:
—— Replace gas heating with chimney,
—— create a new heating group and insulation,
—— regroup existing heating groups and insulate pipes,
—— existing district heating group, pipe replacement and insulation,
- Company building:
—— Groundwater system with heat pump and air conditioning via geothermal probe,
—— Relocation of the district heating pipe and insulation,
—— Heating group ceiling sails for heating and cooling incl. Cable assembly,
—— Heating group radiator existing Connection to new heating group, delivery and installation of new radiators,
- Heating group ceiling system in plaster for heating and cooling,
—— Heating group ventilation connection to heating and insulation,
—— Cold distribution connection to the convection cooler, insulation,
- commissioning,
- Documentation (for further details see submission documents).