New construction 5th pool group 2nd construction lot Lot 2 Process equipment.
In lot 2 the process equipment of the revival of the new 5th basin group will be carried out. The revitalization includes an aeration tank, a compressor station, an intermediate pumping station, an excess sludge pumping station, a measuring house and an MID shaft.