The scope of lot 2 is delivery of a milling system and modification or replacement of existing burners for the existing heat only boiler with a capacity of 120 MW.
The scope includes process design with function guarantees and delivery, installation and commissioning of process equipment.
Included in the scope is fire protection and solutions for preventing spread of dust.