1. The subject of the Order is: Execution of the project documentation together with authorial supervision for the construction of the measuring station Q=250.000 Long Goślina along with the connection pipeline and with switching systems.
2. A detailed description of the subject matter of the Order includes Attachments No. 2 to SWZ - Description of the subject of the Order and Annexes No 1 to SWZ — model contract.
1. The subject of the Order is: Execution of the project documentation together with authorial supervision for the construction of the measuring station Q=250.000 Long Goślina along with the connection pipeline and with switching systems.
2. A detailed description of the subject matter of the Order includes Attachments No. 2 to SWZ - Description of the subject of the Order and Annexes No 1 to SWZ — model contract.