GWK - General Weber Kaserne Höxter, replacement building building 3
Electrical work:
approx. 940 cavity wall boxes with sound insulation, approx. 7550 m NYM-J 3x1.52, approx. NYM-J 3x2.52 18,200 m, approx. 2450 m Fire alarm cable J-Y(ST) 4x2x0.8, approx. 6150m Installation cable J-Y (ST) 4x2x0.8, approx. 425 m Kupa pipe M25, approx. 2000 m Plastic pipe FBY M25, approx. 81 m Fire resistant installation duct E 30 size inside 102 x 259mm, approx. 1400 cable collection holders PVC, approx. 85 pcs. fire bulkhead F90 for 0.1 dm3, approx. 345 changeover switches, approx. 1375 Schuko sockets, approx. 32 presence detectors, one GNSHV 6 fields, approx. 48 circuit breakers 1B10A, approx. 118 switching/blind actuators KNX, approx. 110 LED recessed luminaires, approx. 4450 m EDP cable 4x2xAWG 22 simplex, 48 escape sign luminaire with single battery and a monitoring station incl. maintenance contract to be offered, an offset parabolic fir 120 cm, approx. 12 m NYCWY 4x185 SM/ 95 mm2, sporal use in shell construction phase from mid-September 2023 to June 2024, main phase August 2024 to July 2025