Conversion of the building in 2001 in the old barracks into an 11-group daycare center
In order to prepare the building for the use of a KiTa, extensive demolition measures and a large number of new construction measures are necessary.
This is Lot 12 - Heating works with the following main dimensions:
- 1 compact heating distributor with 6 heating circuits
- approx. 2,800 m of steel heating pipeline, DN 15 - 100 including fittings
- approx. 770 m pipeline climate cold water steel, DN 15 - 65 including fittings
- approx. 320 pcs. fittings, installation parts and accessories
- 2 buffer tanks 1,000/1,500 litres
- 1 st fresh water station
- approx. 60 pcs valves, pumps, measuring equipment, etc.
- approx. 1,900 m² of underfloor heating
- 16 FBH distribution cabinets including heating circuit distributor
- 14 pcs. tube radiators including accessories
- 70 pcs. valve compact radiators incl. accessories
- 1 st connection to local heating station
- approx. 400 core holes diameter 20 - 250 mm