The planned measure involves the installation of internal elevators in the stairwell of the 5-storey prefabricated buildings (plus the basement) in the following objects and house entrances:
- Netzweg 11, 12, 13
The measure concerns spatially connected objects on the same street in the Halle-Nord urban area
For these objects, the work of the outdoor facilities including the fire brigade access routes of this measure must be carried out.
Description of the measures:
- tree felling, shrub clearing;
- Establishment of a fire brigade access paved with lawn joint pavement and concrete rectangular pavement and bordered with deep shelves (part of the concrete rectangular pavement is also a disabled access);
- Applying a drop on board;
- soil modeling;
- lawn sowing;
- planting and care of trees;
- signage.