The existing building is being completely renovated. The new community hall is arranged on the upper floor over two floors.
The library will be installed on the ground floor and basement level. The exterior walls of the building are built on the eaves and gables up to
Blanket removed over 1st floor. The best roof truss as well as the wooden beam ceilings above the 2nd floor, 1st floor and ground floor will be completely expanded.
A new reinforced concrete floor will be installed via the basement, ground floor and upper floor in some areas. The outer walls are reinforced concrete columns from EG
stiffened to the roof. There is a new building in the basement. Spaces for music associations are being created on the east side. Toilet facilities and shooting ranges with ancillary rooms are arranged in the north. In the west, all ventilation and heating technology is installed.
Ground floor: In the north-west, rooms are planned for the adult education center. Access is via the south side with an information entrance hall.
An information hall is planned in the south-east. Upper floor: Side rooms, changing rooms and cloakrooms are planned for the hall on the north side.
Core quantities:
19 wooden windows approx. 100 cm/80 cm
32 pcs wooden windows approx. 105cm/176cm 2 wings with skylight.
4 wooden windows approx. 105 cm/176 cm with G30 glazing
2 balcony doors approx. 105 cm/250 cm
3 entrance doors approx. 126 cm/230 cm
1 sliding door element approx. 296 cm/230 cm
57m window sills wood interior
25 wooden shutters with fillings