Open procedure pursuant to art. 60, 145 et seq. and 157 of Legislative Decree 50/2016 for the assignment of engineering and architectural services relating to the drafting of the final and executive design and to the coordination of safety in the design phase, relating to the intervention called: "Safety and recovery of the disused tunnel of the «Cumana» railway line for the connection to the Bourbon site with Sinus Baianus and the construction of the Paolo di Tarso (Bacoli - NA) car park ».
CUP: F29J16000380001
CIG: 8025666D16
Final design, executive planning and safety coordination in the design phase with regard to the work of "Safety measures and recovery of the abandoned tunnel of the" Cumana "railway line for the connection to the Bourbon site with Sinus Baianus and construction of the parking lot of Paolo di Tarsus (Bacoli - NA) »