Storm-water piping construction work | Tenderlake

Storm-water piping construction work

Contract Value:
-
Notice Type:
Contract Notice
Published Date:
03 March 2023
Closing Date:
21 March 2023
Location(s):
PL613 Bydgosko-Toruński (PL Poland/POLSKA)
Description:
Construction and reconstruction of rainwater sewage system and adaptation of the rainwater sewage system to climate change in the city of Bydgoszcz. Construction and reconstruction. Completion of construction works. IIIb.

The subject of the contract is: - construction of underground retention tanks with a dry pump chamber, technological equipment and ventilation installation, - construction of a retention and infiltration tank, - adaptation of existing water reservoirs, - construction of a technological chamber with a rainwater pretreatment system with ventilation installation, air dryer installation and heating, - implementation of energy supply and control of tanks and technological chamber, - construction gravity storm water drainage, - construction of pressure pipes, - construction of water supply pipes, - construction of gravitational sanitary sewage system, - construction of outlets, - construction of rainwater and meltwater pre-treatment plant, - reconstruction of the existing utilities colliding with the planned investment, - liquidation of the existing inactive utilities of the area colliding with the planned investment, - reconstruction of road surfaces after works related to the implementation of the contract, - construction of exits and access roads, - restoration of green areas, - execution and implementation of executive projects of temporary traffic organization, - felling of trees and shrubs, replacement plantings, - preparation of as-built documentation.

Part 1 of the contract covers the execution of construction works specified in the tasks: 1) C2_K8K9_4.13 "Rain channel no. 1 in Jagiellońska street and in Krakowska street to property no. 18 and 21 along with the reconstruction of the water, sanitary and gas network", 2) C2_K8K9_4.13 "Rain channel ø0.6m in Krakowska street – replacement of the existing rain channel on the section from property no. 18 and 21 to the Brda river – section 1", 3) C2_K8K9_4.13 "Construction of a new outlet to the Brda River in Bydgoszcz", 4) C2_K18K30_5.2b_5.4 "Expansion of the rainwater sewage system in Bydgoszcz in the area of Kard. Stefana Wyszyńskiego", 5) C2_K35_8.1 "Construction of rainwater and meltwater treatment plant before the existing outlet W-55a to the Brda River in the area of Szamarzewskiego Street in Bydgoszcz", 6) C3_K83_8.5 "Construction of a section of rainwater sewage system – outlet to the Młynówka River in Przyrzecze Street in Bydgoszcz", including m.in.: - rain sewers with avg. 1.25x0.75m; 0.9m; 0.6m; 0.4m with a total length of 291m, - rainwater treatment plants, - outlets. A detailed description of the subject of the contract is presented in the Description of the Subject of the Order (hereinafter OPZ), constituting Part III of the SWZ.

Part 2 of the contract covers the execution of construction works specified in the tasks: 1) C2_K45_9.1 "Adaptation of a water reservoir for the purposes of rainwater drainage system with network connections and outlet in the area of Muszlowa and Plankton streets in Bydgoszcz", 2) C2_K45_9.2 "Adaptation of water reservoir No. 2 for rainwater drainage purposes with network connections and outlet in the area of Głębinowa Street in Bydgoszcz", 3) C2_K45_9.3 "Construction of retention reservoir no. 3 with network connections, facility installations and rainwater and meltwater treatment system in the area of Kolbego Street in Bydgoszcz", including m.in.: - adaptations of natural reservoirs, - outlets, - rainwater treatment plant, - retention reservoir with a capacity of 1019m3, A detailed description of the subject of the contract was presented in the OPZ.

Part 3 of the contract covers the execution of construction works specified in the tasks: 1) C2_K45K61_11.2 - "Construction of retention reservoir No. 1 with network connections and object installations in the area of Grunwaldzka Street in Bydgoszcz", 2) C2_K45K61_11.3 - "Construction of retention reservoir No. 2 with network connections and object installations in the area of Grunwaldzka and Skośna streets in Bydgoszcz", 3) C2_K45K61_11.5 - "Development of the rainwater sewage system in the area of Grunwaldzka Street in Bydgoszcz", including m.in.: - retention tanks with a capacity of 384 m3 and 481 m3, - infiltration retention tank with a capacity of 101 m3 A detailed description of the subject of the contract is presented in the OPZ.

Download full details as .pdf
The Buyer:
MIEJSKIE WODOCIĄGI I KANALIZACJA W BYDGOSZCZY - SP. Z O.O.
CPV Code(s):
45232130 - Storm-water piping construction work
45232400 - Sewer construction work
45232421 - Sewage treatment works
45232424 - Sewage outfall construction work
45232431 - Wastewater pumping station
45232454 - Rain-water basin construction work